Facebook Twitter Instagram
    Monday, 18 May
    Twitter LinkedIn RSS
    Hydrogen Technology International
    • Home
    • Advertise
    • Press
    • Subscribe
    Hydrogen Technology International
    Home » GE Renewable Energy’s Haliade-X prototype starts operating at 14 MW
    Renewables

    GE Renewable Energy’s Haliade-X prototype starts operating at 14 MW

    5 October 20213 Mins Read
    Twitter LinkedIn Email
    GE Renewable Energy

    GE Renewable Energy announced today that its Haliade-X prototype in Rotterdam, a port city in the Netherlands, has started operating at 14 MW. With this new milestone, GE Renewable Energy becomes the first industry player to operate a turbine at this power output.

    The Haliade-X 14 MW is an uprated version of the Haliade-X 13 MW, which received its type certification in January 2021. The GE Renewable Energy team has now officially started certification measurements on the Haliade-X 14 MW. One turbine can generate up to 74 GWh* of gross annual energy production, saving up to 52,000 metric tons of C02, which is the equivalent of the emissions generated by 11,000 vehicles** in one year.

    Vincent Schellings, Chief Technology Officer, GE Renewable Energy Offshore Wind, said: “We’re pleased to announce that the Haliade-X prototype is the first turbine in the industry to successfully run at 14 MW. When we first commissioned our Haliade-X prototype in November 2019 at 12 MW, we made a big leap forward in the industry. Over the past two years we have learned a lot about operating and optimizing the performance of our Haliade-X platform, enabling us to uprate the Haliade-X platform to 14 MW today.”

    The ability to produce more power from a single turbine means fewer turbines need to be installed at each wind farm. In addition to less capital expenditure, this also simplifies operations and maintenance, improving the affordability and accessibility of renewable energy for customers and consumers around the world.

    The Haliade-X 14 MW will make its commercial debut at the Dogger Bank C offshore wind farm, which is located over 130 km off the north-east coast of England and, together with Dogger Bank A and Dogger Bank B, is due to become the largest offshore wind farm in the world upon completion. GE Renewable Energy will provide 87 units of the Haliade-X 14 MW for Dogger Bank C.

    GE Renewable Energy is committed to enable the energy transition. As part of that responsibility, the business is focused on supplying and maintaining a global fleet of renewable energy assets, helping reduce the cost of renewable energy, ensuring grid resiliency, efficiency, and reliability, and making renewable energy function in a more dispatchable fashion. GE Renewable Energy also supports the energy transition by pursuing a strategy that reflects a commitment to sustainable, circular design.

    * Gross performance based on wind conditions on a typical German North Sea site
    ** According to EPA Greenhouse gas equivalencies calculator

    renewables wind

    Related Posts

    Shell acquires solar-konzept Italia

    19 January 2022

    BMW: Harnessing wind and hydroelectric power from the Arctic Circle

    29 October 2021

    Vattenfall shortlisted to participate in the first floating offshore wind tender in France

    16 September 2021

    Comments are closed.

    Sections
    • Fuel Cells
    • Hydrogen
    • Misc
    • Renewables

    FREE  directly to your desk twice a year

    The Magazine
    • Hydrogen Technology International is a high-quality, editorially-led international magazine which highlights the latest trends and developments in Hydrogen production and Fuel Cell manufacturing.
    • With a strictly controlled advertising to editorial page ratio, each issue contains news, reviews and technical articles relevant to the developing hydrogen economy.
    About Us

    With over 40 years at the cutting -edge of international business to business publishing, the company has been instrumental in the launch of many leading international technology titles &  international exhibitions.

     

    Useful Links
    • Home
    • Terms and Conditions
    • Privacy Policy
    Contacts

    HTI Production
    Open Space
    Enigma Park
    Malvern, Worcestershire
    WR14 1GP, UK.

     

    Hydrogen Technology International is published by International Business Press Ltd.

    27 Old Gloucester Street, London WC1N 3AX.

    Registered in England and Wales: 9244626

    Copyright © 2021 - 2025 International Business Press Ltd. All Rights Reserved.
    • Magazine
    • Press
    • Advertise
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.

    We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok